PLC HMI Programming Project for a Cascade Environmental Test Chamber
The client needs a PLC HMI programming project for a multi-stage cascade chamber that reaches minus 70 degrees Celsius. The brief covers control logic, temperature sensing, HMI screens over Modbus, and testing and commissioning.
- Open · checked 12 Nov 2026
- 🇮🇳 India (budget currency)
- C Programming
Is the budget fair? The listed budget of ₹12,500–37,500 INR looks tight for a complete control and HMI package covering a cascade chamber. It may be workable only if the scope is limited to the logic and a small set of screens.
What the client needs
- Write the PLC control logic for the cascade refrigeration sequence.
- Configure the analog and RTD temperature inputs.
- Build HMI screens that talk to the PLC over Modbus RTU.
- Test and commission the complete system.
Skills the client asked for: C Programming, Electronics, Microcontroller, PLC & SCADA, Electrical Engineering, Instrumentation, Embedded Systems, Signal Processing.
Where to aim your bid
The sweet spot sits about 40% of the way up the client's range, the same rule AutoBidPilot uses for its own price suggestions. Go higher when the scope is large or unclear; go lower only when you can show close, finished work. Check what you keep after fees with the bid price calculator.
Across the 5 C Programming briefs we have written in INR, the median budget is ₹25,000. We wrote 12 C Programming briefs in the last 7 days.
System overview and hardware
The client needs complete automation logic and an HMI interface developed, tested and commissioned for a -70°C multi-stage cascade refrigeration environmental test chamber.
- PLC: Delta DVP-16SS2 CPU with a DVP08SN digital output module, a DVP04AD-S analog input module and a DVP04PT-S RTD temperature module
- HMI: Flexem 7000 Series (FE7000 / FE7300) over RS-485 Modbus RTU on COM1 at 9600 baud, 7 data bits, even parity, 1 stop bit
PLC programming in WPLSoft
- Use FROM/TO instructions to read PT100 Class A sensors for chamber temperature (D100), specimen safety temperature (D102) and coil temperature (D104), plus pressure transmitters and humidity sensors (D110 to D115)
- Build master safety interlocks (M0) from emergency stops, door switches (X2) and water/airflow switches (X3)
- Add a 2-minute equalization timer (T0) and sequencing so the higher-side compressor starts first, then the lower-side compressor based on discharge/suction pressure and safety trips (M101, M103)
- Control bypass solenoid valves (Y13 to Y17) and the main liquid line solenoid (Y20)
- Implement a PID loop on chamber temperature (D100) with setpoint D20 and tuning registers D200 to D203, driving the booster solid-state relay heater (Y7) via GPWM
HMI programming in FStudio
- Multi-screen interface: home dashboard, refrigeration circuit P&ID, timer/parameter settings, and alarm/trend screen
- Numeric displays for temperatures and pressures (D100 to D115)
- Entry fields for temperature setpoint (D20) and equalization delay (D220)
- Maintained start/stop switch (M10)
- Multi-state lamps for compressors (Y3, Y4), blowers (Y6) and solenoid valves
Deliverables and acceptance
- Error-free compiled WPLSoft ladder file (.wpl / .gxw)
- Compiled FStudio project (.fpg) ready for USB or Ethernet download
- On-site or remote verification of PLC to HMI communication
How to win this project
- Ask for the full I/O list and the control sequence in writing before you quote, since the scope lists many modules.
- Confirm the Modbus address map with the client early, so the HMI and PLC tags line up from the start.
- Plan bench testing with the hardware before commissioning, and say how you will document it.
Questions to ask the client
A specific question in your first message shows you read the brief. Pick one or two:
- Will the PLC and HMI hardware be supplied, or should you specify it?
- Is a test rig available for the RS-485 link before commissioning?
- Who will own the program after handover, and what documentation is needed?
Common questions
How much does a PLC HMI programming project cost?
The listed budget is ₹12,500–37,500 INR. The price depends on the number of I/O points, how many HMI screens are needed and how much testing is included.
What should a PLC HMI programming project proposal include?
A proposal should list the modules you will program, how you will set up the Modbus link, and how you will test and document the logic before commissioning.
Is this project still open?
We checked this project on 10 November 2026. Projects get awarded, so apply soon; we take a brief down when it closes.
This page is our own summary of a project posted online, written to help you decide and to write a better bid. Projects get awarded or closed, so apply soon; we take a brief down when it closes. No job or income is guaranteed.