Substation Design Engineer Needed for a Detailed High-Voltage Design
The client wants a substation design engineer to produce a comprehensive high-voltage design at RIBA Stage 4, using the standards documents supplied. This brief covers the urgent timeline, the £1,500–3,000 GBP budget and what a strong bid should show.
- Open · checked 12 Nov 2026
- 🇬🇧 United Kingdom (budget currency)
- Project Management
Is the budget fair? The £1,500–3,000 GBP budget looks tight for a comprehensive RIBA Stage 4 design on an urgent timeline. It looks workable only if the scope is limited to the drawings the client has already described.
What the client needs
- Show high-voltage or substation design drawings you have produced.
- Confirm you can work to RIBA Stage 4 design detail.
- Explain how you would apply the supplied standards and the note on the 230 V AC auxiliary supply.
- State how soon you can start, given the urgent timing.
Skills the client asked for: Project Management, Engineering, Electronics, Mechanical Engineering, Electrical Engineering, AutoCAD, Product Design, Engineering Drawing.
Where to aim your bid
The sweet spot sits about 40% of the way up the client's range, the same rule AutoBidPilot uses for its own price suggestions. Go higher when the scope is large or unclear; go lower only when you can show close, finished work. Check what you keep after fees with the bid price calculator.
Across the 4 Project Management briefs we have written in GBP, the median budget is £320. We wrote 58 Project Management briefs in the last 7 days.
Project overview
The client needs an experienced high-voltage design engineer for urgent substation design work. The aim is a comprehensive RIBA Stage 4 design, going beyond what is asked where possible. Only a cost for the design works is required now, as the client is at quoting stage while drawings are frozen, and a competitive price is requested.
Design package to be priced
- Layout drawings for small power, lighting and M&E services
- Elevation and section drawings locating all that equipment
- Single line diagrams with distribution board and MCB schedules and circuit details
- Equipment specifications with supporting design calculations
- Environmental design parameters per relevant standards, with calculations justifying M&E sizing
- An Electrical Works Brief covering scope, design intent and implementation
- HVAC covering heating, dehumidifiers and air conditioning
Reference standards and notes
Site standards documents are attached for reference. One deviation applies: the airport operates auxiliary AC systems at 230 V AC rather than the 110 V AC / 230 V AC arrangement, and the design should account for this.
What to send
Applicants should share relevant experience and availability.
How to win this project
- Name the design software you use, such as AutoCAD, and attach a sample engineering drawing, since the client asks for drawings first.
- Explain how you will handle the 230 V AC auxiliary supply note, which differs from the 110 V AC and 230 V AC arrangement you may expect.
- Give a start date and a day count for the first drawing set, since the brief stresses urgency.
Questions to ask the client
A specific question in your first message shows you read the brief. Pick one or two:
- Which standards documents apply, and are they the latest revision?
- What is the deadline for the first design package?
- Who else is on the design team, and who signs off the drawings?
- Do you need surveys or site visits before the design starts?
Common questions
How much does a substation design engineer cost?
The client lists a budget of £1,500–3,000 GBP for this design work. Check whether that covers the full RIBA Stage 4 drawings or only part of the package.
Which skills matter most for this project?
High-voltage design, electrical engineering, CAD drafting and engineering drawings matter most. Show drawings from similar work and name the software you use.
Is this project still open?
We checked this project on 10 November 2026. Projects get awarded, so apply soon; we take a brief down when it closes.
This page is our own summary of a project posted online, written to help you decide and to write a better bid. Projects get awarded or closed, so apply soon; we take a brief down when it closes. No job or income is guaranteed.